"We take pride in our work and the results speak for themselves."
Overview
Client Name: The Time Group
Project: 500 Park Apartments
Location: Baltimore, MD
Facility Type: Multi-Family
Project Size: 148,000 GSF
Project Completion: December 2017
Project Description
500 Park Avenue Apartments located in Baltimore, MD consisted of a newly constructed, six story residential complex. Construction included 153 apartment units, with a mix of studios, one-bedroom and two bedroom units. Additionally, a lower level parking garage and 1st floor retail space was included.
HBS Solutions provided Building Commissioning Services in accordance with the Baltimore City adopted IGCC construction code & requirements. Systems commissioned included all HVAC Systems, Controls, Normal & Emergency Power Distribution, Lighting and Lighting Controls.
Accomplishments
As a result of the building commissioning process, we were able to meet the following goals and objectives:
Through the commissioning process, HBS Solutions identified 33 issues through Construction Static Inspections and Functional Performance Testing. Acceptable resolution was verified on all deficiencies discovered.